English
Get a quote

West Africa

Solar panels, inverters and batteries for Togo

GZ Merx exports solar equipment from Guangzhou to customers in Togo: solar panels, hybrid and off-grid inverters, LiFePO4 batteries, solar water pumps and complete solar systems. Below you will find the technical facts that matter when you order for Togo — grid standard, solar potential, ports and transit time.

Chat on WhatsApp

✓ Best price guaranteed Factory-direct prices with no middlemen, and an itemised quotation within 24 hours.

Key facts for solar projects — Togo

Grid voltage & frequency220–240 V, 50 Hz (three-phase 380–415 V)
Recommended inverterStandard 230 V single-phase or 400 V three-phase models
Solar potentialVery good — about 4.8 to 5.5 peak sun hours/day
Main port(s) / routeLomé
Typical sea transit from China35–50 days
Shipping termsEXW, FOB, CFR, CIF

In West Africa most buyers ask for a complete package to beat power outages: a kVA-rated hybrid inverter, a lithium battery to replace tubular batteries, and mono panels. For Togo we also supply solar borehole pumps and street lights for projects. See how to replace a generator with solar.

Common search terms in Togo (French): “kit solaire”, “onduleur hybride”, “batterie lithium”.

Climate: hot and humid with heavy rain. Use IP65 inverters, corrosion-resistant aluminium mounting with stainless fasteners, surge and lightning protection, and keep batteries in a dry, ventilated room.

With 5.2 peak sun hours, each 1 kW of solar panels in Togo produces roughly 4.2 kWh per day — so a 5 kW system makes about 21 kWh per day.

Frequent power cuts make hybrid inverters with LiFePO4 batteries the most requested solution for homes and businesses in Togo.

Agriculture and water supply are major uses: solar pump inverters and solar pumps can replace diesel for irrigation in Togo.

In West Africa many homes and businesses rely on generators. Solar plus lithium storage cuts fuel costs dramatically. Hybrid and off-grid inverters with generator input, LiFePO4 batteries and solar street lights are in high demand; humid coastal climates favour IP65 equipment.

Recommended equipment for Togo

How ordering works for Togo

  1. Send your requestProduct list, quantities or the system size you need, plus your destination port.
  2. Receive a quotationModels, prices, delivery time and shipping cost — usually within 24 hours.
  3. Confirm and pay the depositWe place the order with the factories and share production updates.
  4. Inspection and balanceGoods are checked and packed; the balance is paid before shipment.
  5. Shipping and documentsYour container sails; you receive the B/L and all customs documents.

Frequently asked questions

Do you ship solar panels and batteries to Togo?

Yes. We ship solar panels, inverters, lithium batteries and complete solar systems to Togo via Lomé, with commercial invoice, packing list, bill of lading and certificate of origin.

How long does shipping from China to Togo take?

Sea transit is typically about 35–50 days, plus 7–25 days for production and loading. We confirm the exact schedule when you order.

Which inverter works with the grid in Togo?

The grid is 220–240 V, 50 Hz (three-phase 380–415 V). We recommend: Standard 230 V single-phase or 400 V three-phase models.

Can I buy a complete solar system for Togo?

Yes. We supply matched kits — panels, inverter, batteries, cables and mounting — from 3 kW for homes to 100 kW+ for businesses.

How much does a solar system cost in Togo?

It depends on the system size, inverter type, battery capacity and quantity, and changes with factory prices and freight, so we don't publish a fixed price list. We guarantee you the best price: send us your load list or the size you need and we reply within 24 hours with an itemised quotation including shipping to Lomé.

Other countries in this region

Tell us what you need — get a quotation within 24 hours

Send your product list, system size or project drawing on WhatsApp or by email.

✓ Best price guaranteed